From the factory floor to project handover.

Equipment, packages and technical information stay connected through pre-shipment review, delivery coordination and operation support.

A row of Tianyu prefabricated substations in the finished-equipment area
Prefabricated substation staging
Mobile substation and project team during Tianyu factory acceptance
UAE mobile substation · factory acceptance

Before the equipment leaves.

Pre-shipment review connects the electrical configuration with the equipment, packages and information to be handed over.

  1. Equipment scope

    Match the supplied configuration with the project equipment and accessory scope.

  2. Inspection and acceptance

    Coordinate factory inspection, agreed testing and inspection records.

  3. Packages and shipping marks

    Align equipment, spare parts, packing-list entries and package identification.

  4. Document handover

    Organise electrical drawings, operating instructions and inspection information for the receiving team.

Equipment and spare parts, organised together.

Packing lists and shipping marks connect each package with its equipment or spare-part scope.

Low-voltage switchgear in the Tianyu finished-equipment area
Finished low-voltage switchgear
  • EquipmentIdentify the supplied equipment and its accessories in the project scope.
  • Spare partsOrganise spare parts with their own packing-list entries.
  • Shipping marksKeep package identification aligned with handover and destination coordination.

Mining energy project in the DRC

The supply scope includes 18 substations for K Mine and 42 for T Mine, together with station-service transformers and spare parts.

Explore the 9 MVA project configuration

The technical package travels with the project.

Engineering information supports equipment receiving, installation and operation. The document package keeps electrical interfaces, equipment arrangement and operating guidance connected.

Discuss your project requirements
  • Electrical designSingle-line diagrams and control interfaces
  • Equipment arrangementOutline and foundation information
  • Operating guidanceBilingual use and operating instructions
  • ProtectionProject protection-setting information
  • VerificationInspection and factory-test records

Support continues into operation.

Technical coordination follows the equipment configuration and the project’s service scope.

Installation and commissioning

Installation guidance, operating instructions and technical coordination support equipment integration and commissioning.

Operation and maintenance

Service procedures support equipment enquiries, operation guidance and maintenance coordination.

Spare-part requirements

Share the equipment details and the part required so the technical team can coordinate the matching requirement.

Tianyu technician working on electrical connections in the factory
Electrical assembly at Tianyu

Tell us where your project is now.

Share the project stage, destination and support you need.

Talk to our technical team